• Commercial & Workplace
  • Domestic
  • About
  • FAQs
  • Online Survey
  • Contact us
  • Enquire Now

Online Survey


Save the Environment

Save Money

Save Time
Start Survey

Please see the information below that is required before starting your online survey.

1. Are you applying for a grant? If so which grant?
WCS OLEV
2. You must supply the MPAN number.

This can be found on an electricity bill. Please see example.

MPAN-number
3. Would you like tethered or untethered?
tethered-untethered
4. Please provide clear photos of the following:

Consumer unit/fuse board showing the fuses.
Close up and 1Metre+ away to show the area around.

fuse-board

The water and gas bonding (green and yellow cable) connected to the gas and water copper pipes.
(Usually these are located at the point of entry into the property)

water and gas bonding
water and gas bonding

The desired Charge Point location.

The desired Charge Point location
The desired Charge Point location

A potential route from the Consumer unit or the meter location.
This is helpful if the charging unit is more than 5 meters away from the consumer unit.
E.g. a long driveway to a garage.

potential route from the Consumer unit
potential route from the Consumer unit
potential route from the Consumer unit
potential route from the Consumer unit
Start Survey Now!
Need more help? Contact us
Loading...

FAQs

  • How long will my Electric Vehicle take to charge?

    The time it takes to charge an electric vehicle can be as little as 30 minutes or more than 12 hours. The speed of the charging point will be dictated by the electricity supply at your property.

    A typical electric car (60kWh battery) takes just under 8 hours to charge from empty-to-full with a 7kW charging point.

  • How much will it cost?

    The cost to charge an electric car varies between home, work and public charging.

    For a typical electric car with a 60kWh battery and 200 mile range you can expect:

    Charging at home: Around £8.40 for a full charge.
    Rapid charging: Rapid charging points are normally found at motorway service stations and typically cost £6.50 for a 30 min, 100 mile charge.

  • How long will it take to do my charging installation?

    Assuming that all relevant grants and admin have been completed, a charging installation can usually be scheduled with a lead time of approximately seven days.

    The installation, on average, will be completed within three hours.

  • Do I qualify for the OLEV grant at my home?

    The OLEV grant allows you to reduce the cost of your home charger by £350. If you qualify for the grant, we can take care of the claim on your behalf.

    Eligibility checklist:
    • You have private or designated off-street parking.
    • Your plug-in car must be purchased after April 2015.
    • You have not made a previous grant-claim for your vehicle.
    • You cannot exceed the allowed limit of two OLEV grant-funded charge points (one each), per-vehicle-per-home

    Click here for more information.

  • Does my business qualify for the OLEV grant?

    The OLEV Workplace Charging Scheme allows you to reduce the cost of workplace charging points by up to £14,000.

    Eligibility Checklist:
    • Can be claimed by any business, charity or public authority (back claiming is not possible).
    • You must have off street parking & be able to outline a business need for electric vehicle charging points.
    • Your charging points must be installed by an OLEV-approved installer, such as myEVCP.co.uk
    • You must apply for a digital voucher and present it to your chosen installer.
    • The grant is capped at £350 per socket, up to 40 sockets.

    Click here for more information.

  • Can I connect my EV Charger to a 3-pin plug socket?

    It cannot be connected to a 3-pin plug socket; the EV Charger needs to be connected to a meter or consumer unit (fuse box) to ensure that it’s properly protected.

  • What happens if my installation is non-standard?

    Non-standard charging installations may incur additional costs. Once your enquiry has been dealt with, we’ll be in touch to arrange your site survey so we can ascertain your individual requirements.

    We will produce a no obligation quote for any additional works to include any possible ground works that may be necessary.

See more FAQs Have a question, contact us

Why We Exist

We want to help you adopt clean transport solutions for everyday life.

We want to make it easy to decide what charging solution is best for you.

Together, we can make sure that our travel is not at the expense of our planet!

  • Commercial & Workplace
  • Domestic
  • About
  • FAQs
  • Online Survey
  • Contact us

My EVCP
Prestige Cars,
Coopers Roundabout,
Hedge End,
Southampton
SO30 2WA

01489 783337
info@myevcp.co.uk

Terms & Conditions Privacy Policy
Copyright 2022 myevcp. All rights reserved.